TRAFFIC STUDIES
(ROAD)
IN PORTUGAL
As consultant of Ascendi, Exacto was responsible for traffic studies concerning all road concessions tendered in Portugal (more than 30), including:
- Marão tunnel – 2007 and 2015 (update)
- Pinhal Interior – 2008 and 2013 (update)
- Update of tRaffic forecasts in North Concession, Great Oporto, Costa de Prata, Beiras Litoral and Alta, Great Lisbon (2012/2013)
- Center Motorways (2009/2010)
- Transmontana Motorway (2007)
- Algarve Litoral (2008), Douro Litoral (2006), Baixo Alentejo (2008), etc
As consultant of Lusoponte Exacto was responsible for traffic studies concerning all road crossings of the Tagus in Lisbon, including:
- Crossings Barreiro/Montijo and Seixal/Barreiro, and Impact f the new Montijo Lisbon airport (2017)
-Third Crossing, option Chelas/Barreiro (2007)
-Third Crossing, options Algés/Trafaria (2005)
-Vasco da Gama bridge (1994)
OTHER MAIN PROJECTS
- Reformulation of A5 interchanges between Cril and Crel (Brisa/Cenor – 2016)
- Reformulation of interchanges in Av. Infante D. Henrique / Av. Marechal Spínola in Lisbon (Cenor, 2013)
- New Funchal Circular Cota 200 (duplication), Madeira (Via Litoral/SRES-2006)
- Express Roads of Madeira (Norvia/SRES, 2002)
- Internal Circular of Lisbon (CRIL) (Profabril e Coba/JAE, 1991, update in 2011)
- External Circular of Lisbon (CREL) (Brisa-1998, update in 2007)
- Freixo Bridge and Internal Circular of Oporto (Profabril/JAE, 1990)
- etc..
WORLDWIDE
BRAZIL
-Traffic Studies for the Odebrecht group, including:
Rota das Bandeiras, Rota do Atlântico, Rota dos Coqueiros, Rota do Oeste, Bahia Norte, Rota das Fronteiras, Via Rio, e Rota do
Horizonte (preparation of short-term and long-term traffic forecasts; traffic monitoring weekly reports for Rota das Bandeiras, Rota do
Atlântico, Rota dos Coqueiros and Bahia Norte road concessions)- between 2014 and 2016;
- Traffic study for Via Cambuí, São José dos Campos (São Paulo)- Viaponte Brasil (2013)
- Traffic study for Trevo de Resende Oeste (Nova Dutra-Rio de Janeiro) , Viaponte Brasil and CCR (2012)
- Traffic Study for Canas Interchange (Nova Dutra - São Paulo), Viaponte Brasil and CCR (2012).
- Traffic study forroad concessions Lotes 6 e 7 - BR163, BR262 e BR267 (Mato Grosso and Mato Grosso do Sul), Engimind Brasil (2013)
- etc..
PERU
Traffic Studies for the tenders relating to new highway and motorway concessions in Peru (Mota- Engil – Peru):
* PanAmericana Sur (Arequipa/Tacna/Chile) – 2012
* Periferico Vial Sur (Lima) – 2012/2013
* Via Expresa: extension to PanAmericana Sur, Lima – 2011
* Callao/Lima/Canta, new motorway – 2012/2013
* Canta/Huaylay, new highway – 2011/2012
UKRAINE
* Traffic and Economic Profitability Study for the future Ring Road in Kiev, Ukraine (Zagope) - 2012
CONGO DEMOCRATIC REPUBLIC
Traffic and Economic Profitability Study for the future road Kasumbalesa-Mokambo, in Katanga, 2016 (Norvia)